Major Projects
Stuttgart 21, New Railway Line (NBS), Neu-Ulm 21 (2003 – present)
- Consulting and services for the client
- Consulting and strategy development for waste management processes; management of the BoVEK team
- Waste management and soil protection concepts
- Consulting and review of construction contract tender documents
- Environmental construction supervision (UBB)
- Soil expert services
- Waste management law compliance and monitoring tasks
- Soil science construction supervision (BBB)
Services provided in various Planfeststellungsabschnitte (PFA) for the construction companies
- Consulting and strategy development for waste management processes (including classification, coordination, sampling strategies and support in determining disposal routes)
- Waste disposal / soil protection concepts
- Soil / waste specialist and expert services for PFA 1.3a, PFA 1.4, PFA 2.1ab/c and PFA 2.3 VE4 (sampling / classification and declaration of all waste / documentation in accordance with the US60 process)
NBS Karlsruhe–Basel, PFA 8 Freiburg Freight Rail Bypass (2018 – present)
- Consulting and strategy development for Environmental Specialist Construction Supervision (UBÜ)
- Comprehensive GIS project combining all available geodata and planning data, including deficit analysis regarding sampling and the definition of priority areas for various topics (including waste, contaminated sites, soil protection and soil reuse)
Fixed Fehmarnbelt Link – Fehmarn Island Section (2014–2016)
- Consulting on waste management and soil protection
- Development of material management and soil protection concepts as part of the planning approval process for the German section of the project
- Support throughout the planning and approval process
- Development of checklists for detailed execution planning
NBS Cologne–Rhine/Main – Central Section, predominantly Contract Lot B (1998–2002)
- Investigations of:
- groundwater, stratified groundwater, streams and wastewater
- construction materials, soils and soil air
- waste and contaminated sites (including extensive and complex remediation projects)
- Health and safety planning and supervision
- Waste management and waste balances
- Remediation documentation
- Remediation and demolition of a paint manufacturing plant
NordLink (2015-2016)
- Consulting on waste management, soil protection and Environmental Construction Supervision (UBB) covering waste, soil, water bodies, immission control, species protection and nature conservation, in cooperation with network partners
- Including review and analysis of planning approval documents and construction contracts

SuedLink (2020–present)
- Consulting on waste management, soil protection and contaminated sites
- Waste management and documentation, Lots 1–10
- Environmental construction supervision, Lots 9 and 10 (Heilbronn to Würzburg)
- https://www.transnetbw.de/de/netzentwicklung/projekte/suedlink

Expansion to Multiple Tracks: S6 Frankfurt–Friedberg (2018–present)
- Consulting services, particularly regarding asbestos, as part of Environmental Specialist Construction Supervision (UBÜ)
- Project information (DB) https://www.s6-frankfurt-friedberg.de/kurzportrait.html

Long-Term Support for Companies and Construction Projects
Expert Support for Regional and National Construction Companies
- Environmental consulting and expert services in the fields of waste management, environmental protection, contaminated sites and soil protection (sampling strategies, classification and declaration, organization of disposal routes, expert support for material flow management)
In-house / third-party monitoring at open-pit mines, quarries and clay pits
- In-House / Third-Party Monitoring at Open-Pit Mines, Quarries and Clay Pits
- Quality management and organization of the acceptance process for mineral waste
- Expert consulting regarding the acceptance of waste batches
- Support with regulatory requirements and permitting matters
- Third-party monitoring: sampling and reporting
- Soil protection law compliance support during recultivation
ENM – Expert Support for Waste Management Processes for Utility Companies (Gas Pipelines)
- Recommendations for material separation and optimization of waste management processes
- Support and documentation of exploratory trial pits
- Classification of road and pipeline corridor construction waste
- Sampling of excavated material stockpiles
- Support in organizing waste disposal
EVM – Cochem Contaminated Site Remediation, Former Gasworks (2011–2019)
- Historical investigation / preliminary investigation in several phases
- Consulting during investigations of soil, groundwater, waste and contaminated sites
- Risk assessment
- Occupational health and safety concept for work in contaminated areas
- Planning and consulting
- Contaminated site remediation (including extensive and complex remediation projects)
- Health and safety planning and supervision, waste management, waste balances and remediation documentation
Expert Support for Municipalities
- Environmental consulting and expert services in the fields of waste management, environmental protection, contaminated sites and soil protection
- Management of waste producer obligations for hazardous waste (eANV)
- Sampling and disposal consulting for smaller-scale projects (road renewal, residential development, demolition projects, sampling of stockpiled materials and support with the organization of waste disposal)
Other Representative Services:
- Assessment of contaminated sites and historical deposits (historical investigation / preliminary investigation)
- Groundwater and soil air sampling
- Building contaminant registers
- GIS projects
- Quality management concepts for mineral waste
- Soil science construction supervision during topsoil removal and filling operations, as well as construction activities involving topsoil










